A new electrical panel was selected to accommodate the new loads. An electric water heater was selected and installed to provide hot water to the space. Plumbing system was designed for the new fixtures to be tied into the existing base building system. After completion of installation, special and progress inspection were performed on the mechanical system for compliance with approved plans and energy code requirements.
.