• Location: 309 W 103rd St. NY, NY 10025
  • Device Installed: 1″DCVA and 2-1/2″DCDA
  • Description: Designed a new 1” DCVA on the domestic service due to the non hazardous condition of a boiler with with internal rpz protection. A new 2-1/2” DCDA was designed for the sprinkler service. Proper clearances were provided to meet NYC DEP regulations. These plans were prepared and submitted to resolve the NYC Environmental Protection order (NYC EP) issued to the premise.